Technical and General Information

This package provides clients with technical and general information relevant to operations at Queen’s Hall. Clients are requested to comply with all regulations as stated. Included in this package are the following documents:

Critical Requirements

  1. Queen’s Hall’s Technical Information Sheet – Clients must complete this form advising the Technical Coordinator of their requirements for lighting, sound, stage, etc., one (1) month before load-in. Stage measurements and other technical information will be made available upon request to the Technical Coordinator.
  2. Rehearsal and Performance Sheets (R&P) – Clients must sign a completed R&P Sheet for each rehearsal and/or performance.
  3. Queen’s Hall’s Backstage Security Log – Clients are required to provide a listing of all personnel entering backstage (performers, technical crew etc.), to the Technical Coordinator two (2) weeks before load-in.
  4. The Production’s Stage Manager is responsible for securing all valuables brought into the Hall

Leave a review

Please leave a review

Whether you attended a concert, a play or a private event, we want to hear from you. Your feedback helps us improve our services for every patron.


Review Form

This will close in 20 seconds